1st Stage of Shorook City WWTP & Adding Tertiary Treatment for the Hykstep WWTP, Egypt
CLIENT NAME The Construction Authority for Potable Water & Wastewater (CAPW)
OWNER The Construction Authority for Potable Water & Wastewater (CAPW)
LOCATION Shorook City, Egypt
DURATION 2009 – Ongoing
PROJECT ESTIMATED VALUE EGP 330 Million
Overview:
  • 1st Shorook City WWTP: Collect the raw wastewater, treat it a tertiary treatment, reuse in the irrigation of the city landscape & design to reach a capacity 200,000 m3/day
  • 2nd Hykstep WWTP: Tertiary treatment now is being added to the plant with capacity 27,000 m3/day.
  • 3rd Main Irrigation network for Shorook City: Pipeline diameters (100 – 900 mm), with total length 300 km. Provide survey data for pipeline in coordination with the contractor
 
Scope:

Detailed design drawings review, technical specification and construction supervision