Extensions of Abu Rawash Wastewater Treatment Plant, Egypt
CLIENT NAME The Arab Contractors (AC)
OWNER The Construction Authority for Potable Water & Wastewater (CAPW)
LOCATION Abu Rawash, Western Sector of Giza , Egypt
DURATION 2005 – 2008
PROJECT ESTIMATED VALUE EGP 150 Million
Overview:
  • The WWTP is working by Primary Treatment with an average capacity of 400,000 m3/day.
  • The Arab Contractors is now working for plant extension to reach an average capacity of 1,200,000 m3/day.
  • The project includes Transmission of Treated WW from Abu Rawash WWTP to Green Buffer of 6th October City. 
 
Scope:

Preparing detailed design drawings for both main treatment and extensions as follows:

  • Power House Building No. (45)          
  • Generator Building No. (50)
  • New substation Building No. (51)
  • New medium voltages switch board building No. (52)
  • Effluent channel to Barakat Drain
  • Collecting Channels of 8 Primary Settling Tanks (PST)

 

Main Data  
Average Flow 400,000 / 1,200,000  m3/day
Peak Flow 600,000 / 1,800,000  m3/day