EPC Electrical GIS Substation & Construction 380 kV OHTL Double Circuit RIC S/S #3, KSA (Contract No. 099-C05)
CLIENT NAME Royal Commission for Jubail and Yanbu, KSA
OWNER Royal Commission for Jubail and Yanbu, KSA
LOCATION Ras El Khair Industrial City, KSA
DURATION 2014 – 2017
PROJECT ESTIMATED VALUE SAR 500 Million

Overview:

The objective of the project is to connect 380 kV Substation # 3 in Ras El Khair Industrial City with Saudi Electricity Company grid, in addition to  380 / 115 / 33 kV substation #3 is constructed by :

  1. Constructing two (2) 380 kV double circuit Overhead Transmission Lines on lattice steel towers from Wasit 380 kV substation and 380 kV Substation # 2 to Substation # 3.

  2. Constructing one (1) 380 kV double circuit Overhead Transmission Line on lattice steel towers from 380 kV Substation # 2 to Substation # 3. 

  3. Substation #3 is connected to Saudi Electricity Company (SEC) network through 380 kV overhead power lines.

  4. The project also includes the necessary modifications / additions to the protection, control, communication, SCADA and associated equipment at three remote end 380 kV substations supplying power to substation #3

 
Scope:

Preparing complete Engineering, Procurement and Construction (EPC) bid package including concept design drawings, Request for Proposal (RFP), Project Technical Specification (PTS), Project Construction Schedule, Project Cost Estimate and Manpower Tabulation. In addition, reviewing contractor’s base and detail design, providing design approval and engineering support to the client during construction.