Sort by Business Lines Location
Gathered Intersection projects in KSA
CLIENT NAME Sinopec International Company
OWNER Ministry of Municipal & Rural Affairs, Municipality of Eastern Region
LOCATION Jubail & Dammam, KSA
DURATION 2009
PROJECT ESTIMATED VALUE EGP 1 Billion
Overview:

The project includes 4 projects

  • Intersection King Khalid bin Abdul Aziz & Jubail highway; where 2 bridges one overflies the other. The structure systems consist of concrete box girder deck rested on concrete piers. Pre-stressing system is used only through four curved bays of the bridge. Pile foundation systems used under all footing except the abutment & back retaining wall where isolated footing system used. 

 

  • King Khalid bin Abdul Aziz and 42nd Street intersection; the project consists of 11 continues span pre-stressed reinforced concrete box girder deck supported by concrete piers. The bridge foundations are shallow type

 

  • King Fahd bin Abdul Aziz road and Abu Bakr Siddique; the project consists of grade bridge and underground tunnel. The grade bridges consist of precast pre-stressing deck rested on the underpass retaining walls. Pile foundation system is used under all intersection elements

 

  • Omar bin Al Khatab road and King Fahd road instersection; the project consists of two grade bridge, underground tunnel and flyover bridge. The structure system of the flyover bridge consists of pre-stressing box girder deck rested on concrete pier. The grade bridges consist of precast pre-stressing deck rested on the underpass retaining walls. Pile foundation system is used under all the intersection elements

 

Scope:
  • Structural design review of the different elements of the bridges, tunnel and underpass
  • Structural redesign of the unsafe elements of the bridges and tunnels
  • Preparing the shop drawings for the different elements of the bridges and tunnel
  • Structural design of foundation form work of the bridge
  • Geotechnical design of shoring and dewatering system