Ras Ghareib - AMEA Wind Power project, Egypt
(500 MW)
Client
AMEA Power L.L.C.
Owner
New and Renewable Energy Authority (NREA)
Location
Ras Ghareib, Egypt
Duration
2020 – 2021
Project Description
The project consists of the development, construction, operation, and ownership of a 500-MW Wind Power facility. The site occupies around 70 km². The structures of the project include 190 wind turbines, pad mounted transformers, MV collector system, substation, main control room, O&M Building, and infrastructure.
Scope
Topographical survey; drilling 20 boreholes with SPT; excavating 20 trial pits; installing 20 piezometers; performing 20 pressuremeter tests, 20 falling head tests, 20 electrical resistivity measurements, 20 thermal resistivity measurements, and 20 seismic refraction survey with associated MASW.