NEOM’s Spine Water Transmission line West (SWT), KSA
Client
PETROJET
Owner
NEOM
Location
KSA
Duration
2022 - 2025
Project Description
The SWT is a DN2000 pipeline that provides potable water for the Spine Infrastructure and the Line buildings in NEOM. This Contract package includes the Design, Build and Testing & Commissioning for a fully operational pressurized Permanent Water System within a concrete box culvert that runs along the length of the NEOM Spine between chainage 6+000 and chainage 44+000 with a total length of 38 Km. The box culvert will also serve as a utility corridor for the Water transmission line and additionally for Information & Communication Technology (ICT).
Scope
The works include progressing the Concept Design provided by the Employer to detailed design, supply, construction, and the installation of all associated materials, equipment and finally testing & commissioning of the system and handover. The works include also:
- Verification and development of the provided reference Concept design
- Design of the DN2000 pipeline and the box culvert through 3A, 3B, 3C and 3D design stages including the following: Earthworks; MEP including Fire Life Safety; Valves. Structural Concrete; Interconnections for the future pipe within the Spine water box culvert; Backfilling to the final grade level; All control and mechanical works; Pipeline; Main Control and Security rooms; TOCs to the Reservoirs & the Line buildings; Reinstatement and restoration to final landscape; SCADA systems
- BIM modeling for all project components using Digital Twin Delivery (DTD)
- GIS information database
- Quantity surveying
- All special studies related to works (Durability, constructability, …)
- Geotechnical tasks; Preparation of Geotechnical request for proposal; Preparation of Geotechnical Interpretative Report; Preparation of Slope Stability Report for Temporary Slopes; Design of Side Support System and Deep Foundations for Future Crossings; Design of Dewatering System; Design of Ground Improvement Systems