Sewage Networks, Pumping Stations and Forcemain Lines in Al-Aziziyah and Al-Khobar City, KSA
Client
Bin Omairah Contracting Company Limited (BOC)
Owner
National Water Company (NWC)
Location
Khobar, KSA
Duration
2024
Project Description
The project comprises Sewage networks, Pump stations, and forcemain lines in Al-Aziziya and other areas in Al-Khobar as follows:
- Gravity Networks with diameters range (200 – 1100) mm with total approx. length 144,510 m
- Forcemain Lines with diameters range (150 - 900) mm with total approx. length 23,626 m².
- Four New Pump stations:
1. Al Fawaziya Pump Station with flow rate 100 m³/hr & total head 30 m
2. Ibn Sina Pump Station with flow rate 200 m³/hr and total head 30 m
3. Al-Taliya Pump Station with flow rate 250 m³/hr and total head 30 m
4. Al Tawoon Pump Station with flow rate 450 m³/hr and total head 30 m
- Upgrading 5 existing Pump Stations:
1. Golden Belts Pump Station to reach capacity 650 m³/hr and total head 30 m.
2. Bandariyah Pump Station to reach capacity 250 m³/hr and total head 20 m.
3. Al-Janabiyah Pump Station to reach capacity 5,090 m³/hr and total head 35 m.
4. Thuqba Industry Pump Station to reach capacity 125 m³/hr and total head 25.
5. Petromain Pump Station to reach capacity 1350 m³/hr and total head 65 m.
Scope
- Concept design report according to NWC format with a schematic drawing & BOQ.
- Detailed design stage with detailed BOQ.
- Shop drawing stage with detailed BOQ
- As-Built drawing stage.
- Technical support during construction phase