Water Transmission System from RE3 to Mountain Reservoir, Neom, KSA
Client
Al-Rashid Trading & Contracting Co. (RTCC)
Owner
NEOM
Location
Neom, KSA
Duration
2024 - 2026
Project Description
The project’s overall objective is to provide the necessary infrastructure required to transfer 95 Million Liters per Day (MLD) of potable water from Lower Mountain Reservoir to Mountain Reservoir. The project comprises the following:
- Mountain Pumping Station (MPS1) – design flow 95 MLD+ 5 Millions of Liters (ML) Water Tank
- MPS2 – design flow 95 MLD + 5 ML Water Tank
- MPS3 – design flow 95 MLD + 5 ML Water Tank
- MPS4 – design flow 95 MLD + 5 ML Water Tank
- Mountain Reservoir (MR) – capacity 60 ML
Scope
- Study and review the documents of 3C package with vendors’ data and provide comments.
- Preparation of 3C design and implementation of the selected equipment in BIM model
- Preparation of clash report & coordination for 3D Modelling.
- Preparation of 3D design package (Architectural, Civil - Roads & Earthworks, Electrical, Low Voltage, ICT, Mechanical & Process Piping Drawings, Plumbing & Drainage, and Structural Works) in addition to BIM modelling as per NEOM standards.
- Construction Supervision