Al Taif – Al Baha Water Transmission System, KSA
Client
Arabian Pipeline Projects Company (APPCO)
Owner
Saline Water Conversion Corporation
Project Estimated Value
SAR 1.2 Billion
Location
KSA
Duration
2011 – 2012
Project Description
Detailed engineering services for Al Taif – Al Baha water transmission system in Saudi Arabia
The Water Transmission System consists of:
- Al Taif Pump Station ARADA (2 sets of pumps, flow rates 636 l/sec. and heads 370,160 m)
- Reservoirs of (Al Baha, Shuhada, Sudyrah, Shugsan, Gazail, & Mandaq) with capacities from 1500 to 140,000 m3
- Transmission main pipe line of diameter 1000 mm from steel pipes with total length about 200 km
Scope
- Providing detailed design for the main pipe line including preparing pipe alignment sheets, stress analysis, determine the wall thickness for the steel pipes and its grade
- Preparing the detail design for all the civil, electrical, mechanical, landscape and architectural works for the main pump station (PS ARADA) and all the reservoir stations along the pipe line route