EPC Electrical GIS Substation & Construction 380 kV OHTL Double Circuit RIC S/S #2, KSA

(Royal Commission Contract No. 027-T09_ 099-C02 & 100-C01)

Client

Royal Commission for Jubail and Yanbu, KSA

Owner

Royal Commission for Jubail and Yanbu, KSA

Location

Ras El Khair Industrial City, KSA

Duration

2014 – 2016

Project Description

The objective of the project is to connect 380 kV Substation # 2 in Ras El Khair Industrial City with Saudi Electricity Company grid, Bulk Supply Point Substation RIC S/S # 2 380 / 115 / 33 kV has been constructed under this project by:

1. Disconnecting the line segment between two dead end towers of existing 380 kV double – circuit Overhead Transmission Line “Ras El Khair SWCC PP S/S – Wasit” in front of RIC S/S #2.

2. The existing Ras El Khair SWCC – Wasit 380 kV double circuit transmission line was crossing through RIC (Ras El Khair Industrial City) area.

Scope

Reviewing contractor’s base and detail design and providing approval. Providing engineering support to the client during construction