EPC Electrical GIS Substation & Construction 380 kV OHTL Double Circuit RIC S/S #1, KSA
(Royal Commission Contract No. 027-T09_ 099-C01)
Client
Royal Commission for Jubail and Yanbu, KSA
Owner
Royal Commission for Jubail and Yanbu, KSA
Location
Ras El Khair Industrial City, KSA
Duration
2014 – 2016
Project Description
The project is constructing 380 kV Substation # 1 in Ras El Khair Industrial City (RIC S/S #1) and connect with Saudi Electricity Company grid by constructing one (1) 380 kV double – circuit Overhead Transmission Line (OHTL) from Ras El Khair SWCC 380 kV S/S and another one from the existing Manifa 380 / 115 kV S/S.
Scope
Reviewing contractor’s base and detail design and providing approval. Providing engineering support to the client during construction