King Abdul Aziz Road Development, Yanbu, KSA
(Royal Commission Contract No. A-0070C)
Client
Royal Commission for Jubail & Yanbu
Owner
Royal Commission for Jubail & Yanbu
Project Estimated Value
SAR 250 Million
Location
Yanbu Industrial City, KSA
Duration
2013 – 2015
Project Description
“Expansion and Development of King Abdul Aziz Road in Yanbu Industrial City” includes adding lane in each direction to be three lanes instead of two along of 21 km of the road.
Scope
- Design of longitudinal sectors and cross sections of the road, divided as follows; the first sector (11 km long): from the starting point till the intersection with the city major floods spillway. The second sector (10 km long): from the city major floods spillway till the checkpoint.
- Infrastructure works related to expansion (Utilities diversion); existing water and irrigation lines (500 mm diameter), existing sewer Lines (400 mm diameter), existing communication and electricity cables, design of irrigation lines (200 mm diameters) for the road island, design of storm drainage network, electricity and telecommunications networks.





