Engineering Consultancy Services for Samsung on call-off basis, Egypt
Client
Samsung Electronics Egypt Company S.A.E.
Owner
Samsung Electronics Egypt Company S.A.E.
Location
Beni Suef, Egypt
Duration
2023 - 2025
Project Description
This project is a call‐off basis, includes the following projects:
1. Samsung New Warehouse area; this project consists of administrative building (concrete structure), 2 floors. Main storage (steel structure), 1 floor. And hazard storage & chemical storage (concrete structure).
2. Samsung New Mobile Factory; a steel structure building, ground and mezzanine.
3. Samsung Connection Building; a steel structure building, 2 floors with total built up area of 3500 m2.
4. Samsung Tablet Remodeling; In line with market demands, Samsung has requested remodeling for the Tablet factory constructed on 2021, aiming to integrate it as an extension of the New Mobile Factory. EGEC Scope was to update the Architectural and MEP work to achieve the new updates (adding new production building, replacing the storage with employee offices, ...etc) without affecting the steel structure building.
Scope
1. Geotechnical investigation, design and construction supervision for the connection building, and the new warehouse area projects
2. Geotechnical investigation, design review, permit issuing and construction supervision for the New Mobile Factory
3. Renovation design and construction supervision for the Tablet remodeling





