132 kV OHTL, Nisha – Marat Area, KSA
Client
Haif Company
Owner
National Grid N.G.
Location
Nisha – Marat Area, KSA
Duration
2024
Project Description
The project is a 132 kV Overhead Transmission Line. The project includes design, installation and construction of new double circuit 132 kV in three phases, using bundle conductor per phase, vertical configuration, (2x402 mm2) ACSR/AW.
Scope
Detailed Design package for 132 kV OHTL in three phases, using bundle conductor per phase, vertical configuration, (2x402 mm2) ACSR/AW.