Data Volt Yanbu Data Center Building, Yanbu, KSA
Client
Data Volt
Owner
Data Volt
Project Estimated Value
SAR 160 Million
Location
Yanbu Industrial City, KSA
Duration
2026
Project Description
Yanbu data center consists of ground, and roof floors, its built-up area of Phase-1 (1 MW) is about 1558 m2.
The plot area for the project is 11,993 m2.
Yanbu data center is 4 MW IT load – Certified Tier III located in Yanbu City, with No. 4 separate DC buildings each 1 MW IT load.
The Rack density is 8.33 KW/Rack.
Scope
Design review and validation