Water Transmission System from RE3 to Mountain Reservoir, Neom, KSA

Client

Al-Rashid Trading & Contracting Co. (RTCC)

Owner

NEOM

Location

Neom, KSA

Duration

2024 - 2026

Project Description

The project’s overall objective is to provide the necessary infrastructure required to transfer 95 Million Liters per Day (MLD) of potable water from Lower Mountain Reservoir to Mountain Reservoir. The project comprises the following:

- Mountain Pumping Station (MPS1) – design flow 95 MLD+ 5 Millions of Liters (ML) Water Tank

- MPS2 – design flow 95 MLD + 5 ML Water Tank

- MPS3 – design flow 95 MLD + 5 ML Water Tank

- MPS4 – design flow 95 MLD + 5 ML Water Tank

- Mountain Reservoir (MR) – capacity 60 ML

Scope

- Study and review the documents of 3C package with vendors’ data and provide comments.

- Preparation of 3C design and implementation of the selected equipment in BIM model

- Preparation of clash report & coordination for 3D Modelling.

- Preparation of 3D design package (Architectural, Civil - Roads & Earthworks, Electrical, Low Voltage, ICT, Mechanical & Process Piping Drawings, Plumbing & Drainage, and Structural Works) in addition to BIM modelling as per NEOM standards.

- Construction Supervision