Zafarana Solar PV Power Plant, Egypt

(50 MW)

Client

GOPA-International Energy Consultants GmbH

Owner

New and Renewable Energy Authority (NREA)

Location

Zafarana, Egypt

Duration

2019 − 2021

Project Description

Implementation of a 50 MW PV power plant is currently a well-developed topic. There is a huge number of PV power plants in this range implemented all over the world. Nevertheless, the specific conditions of the project ask for highly experienced experts to handle this process. Expertise needed is not only on the technical, environmental and social level, which is indispensable, in addition to this project also requires a strong emphasis on team management expertise, teaching and training capabilities and strong communication skills.

Scope

EGEC was acting as a local subcontractor to GOPA-Intec in this project on the terms and conditions stipulated in the present sub consultancy contract. Assist the team of key experts in the Pre-Construction and Construction Phase of the project, evaluation of the contractors technical and financial offers, awarded contractor technical and financial negotiations, contracting, review all project documents and design approval, construction supervision for all implementation work. Finally test and commissioning for all plant systems.

Geotechnical Investigation and Geophysical Measurements for PV Plant, Interconnection, and Substation