King Abdul Aziz Road and 28ᵗʰ Street Intersection, Dammam, KSA
Client
Sinopec International Company
Owner
Ministry of Municipal & Rural Affairs, Municipality of Dammam
Project Estimated Value
SAR 240 Million
Location
Dammam, KSA
Duration
2015
Project Description
The intersection of King Abdul Aziz Street with 28ᵗʰ Street in Dammam, KSA comprises a flyover bridge & underpass tunnel.
The structural system for the bridge consists of a post-tensioned concrete box girder rested on concrete piers, while the tunnel consists of 2 soil-supporting retaining walls connected by a raft foundation & selective spans are covered by a pre-stressed voided RC slab.
Scope
- Pile analyses and design for the two-level flyover of the project & preparation of final foundation recommendations based on two different geotechnical investigation reports.
- Complete design of a deep well dewatering system for the underpass of the project requiring 12-m deep excavation.
- Complete design of the most appropriate shoring system for the project underpass requiring 12-m deep excavation.
- Structural design review and redesign of both flyover and underpass structural elements of the project.