Souq Waqif Substation, Qatar

(11/0.415kV)

Client

Private Engineering Office (PEO)

Owner

Private Engineering Office (PEO)

Project Estimated Value

QAR 25 Million

Location

Souq Waqif Area, Qatar

Duration

2013 – 2014

Project Description

The project consists of 3 stages as follows:

- Stage-1: Data gathering and studying the existing network

­ Study of the Existing MV and LV network

­ Identify the areas/buildings being served by the existing LV Panels/Substations

­ Identify the no. of the outgoing cables from the existing LV Panels

Relocation of the existing substations (S/S nos. 4093 and 0418) and combine these 2 substations into 1 underground substation

- Stage-2: Design work

Substation Building, Infrastructure work, and Approvals

- Stage-3: Tender Stage

Scope

Design, tendering and construction supervision